Power Tailgate Installation Cost in Thailand: What You Are Actually Paying For

2026-11-07 · JYJ Performance

Power Tailgate Installation Cost in Thailand: What You Are Actually Paying For

" How much does it cost?" is the first question, and the least useful answer is a number. Not because suppliers are hiding something, but because the total is built from three separate costs that move independently — and two of them are not controlled by whoever sells you the kit.

This page breaks the total into those three parts, explains what moves each one, and tells you what to get in writing before you commit. No prices are quoted here, because a figure that has not been verified for your vehicle, quantity and destination would be a guess dressed as information.

What the question actually is

Buyers usually mean one of three things, and it is worth knowing which:

  1. The whole job, drive-away — kit delivered and installed, one number.
  2. The kit alone, delivered to Thailand.
  3. The labour only, if they already have the kit.

These three costs have different owners. The kit price is set by the supplier. Freight and duty are set by the route. Installation labour is set locally. A supplier quoting you "drive-away installed" is either bundling a guess, or working with an installer they control.

Part 1: the kit

The kit price depends on three variables:

Vehicle model. Kits are configured per programme, not universal. A programme with more specific parts — a dedicated latch variant, model-specific brackets — costs more to produce than a simpler one.

Quantity. Minimum order is 100 sets per order, and mixed models can be combined in one order subject to confirming the model list first. Above the minimum, price steps down by quantity tier; the tiers are stated on the quotation, not on a web page, because they differ by programme.

What is in it. A complete kit has six part groups: two power struts, a vehicle-programmed control module, a pre-terminated harness, a soft-close latch, switches, and model-specific brackets. If a quote is dramatically cheaper, the first thing to check is whether all six are actually included — this page explains what is missing from a cut-down kit.

Part 2: freight and duty

This is the part most buyers underestimate, and it is not ours to set.

Freight depends on destination, shipment volume and mode. A single kit and a 100-set pallet have very different per-unit freight. Sea freight on a full order is a different calculation from air on a sample.

Import duty and tax depend on how the goods are declared and on Thai customs classification. We do not rule on your landed cost, and any supplier who quotes you a guaranteed landed cost without asking about your import arrangements is guessing.

What we do: state the terms clearly. If your quotation is CIF to a Thai port, that is where our responsibility ends. If it is FOB, it starts earlier. The terms on the quotation tell you which, and you should never accept "shipping included" without those three letters.

Part 3: installation labour

Labour is local, and it is the part with the widest range.

A configured kit with factory connectors takes a different amount of time from a universal kit that needs wiring work. That is not marketing — it is the difference between an installer following a procedure and an installer solving a problem. On a job like this, the second one is billed by the hour.

The variables that move labour cost:

Our kits are specified as plug-and-play with factory connectors, no wire cutting and no programming — which is what keeps the labour estimate predictable for whichever workshop you use.

What to get in writing before you commit

This is the part that saves money regardless of which supplier you choose:

  1. The item list, with quantities — not just "complete kit".
  2. The Incoterm — FOB, CIF, or delivered. Never accept "shipping included".
  3. The lead time and when it starts — about 30 working days after order confirmation and receipt of deposit.
  4. Payment terms — 50% with the order, balance against copy of B/L. Final terms are on the quotation.
  5. What the quotation excludes — duty, local tax, installation labour. Ask explicitly.
  6. Sample availability — sample kits ship in 1–7 days, which is the cheapest way to validate fit and installation time before committing to a full order.

What we do not do

What we can do is quote the kit and the terms within one business day, in writing, with the item list and the Incoterm stated. From that you can price the other two parts with real information instead of a guess.

What to do next

Send the vehicle model and year, the quantity you are considering, and the destination port. We will return the kit quotation with the item list, Incoterm and lead time — within one business day.

Related reading