Short answer: Mixed models can be combined in one order. The minimum is 100 sets per order, and the quantity of each model within that order is confirmed when the model list is set, because every programme needs its own control module and its own carton marking. Lead time is about 30 working days after order confirmation and deposit.
What the question actually is
A distributor does not sell one vehicle model. Their market buys Kicks, HR-V, Yaris Cross, Xpander and a long tail of others in proportions nobody can predict precisely. So the practical question is not "can I order 100 sets of one model" but "how do I fill a container without over-buying one model".
Behind that sit four real questions:
- Is there a minimum per model, or only per order?
- How does the container get filled without holding dead stock of one programme?
- How are cartons marked, so the warehouse can separate them on arrival?
- What does mixing do to the lead time?
Each has an answer, and the honest ones are more useful than a flat "yes, we mix".
Why mixing is not free
It is worth understanding what changes when an order stops being single-model.
Every programme has its own control module. A Kicks module will not run an HR-V. So a mixed order requires the correct number of each module, programmed for that vehicle, rather than a single run of one type.
Every carton carries a model marking. A container with six programmes has six carton types. That marking is what makes the delivery checkable on arrival — and it is work that does not exist on a single-model order.
Production scheduling gets more complex. Runs have to be sequenced so the right quantities finish together for one loading date, rather than one long run of a single part.
None of this makes mixed orders impractical. It does mean the minimum quantity within a mixed order is a scheduling question rather than a catalogue question, which is why it is confirmed when the model list is set rather than listed as a fixed number.
How we handle a mixed order
Step 1 — The model list. You send the models, year ranges and quantities. We confirm which programmes apply to each, and flag any that need further checking before they can be quoted.
Step 2 — Confirm the split. We confirm the per-model quantities that the production schedule can hold within the 100-set minimum order, and the delivery date for that mix.
Step 3 — Quotation in writing. Item list per programme, quantity split, price for the order, Incoterm, and the dates we can hold.
Step 4 — Deposit and production. 50% with the order; about 30 working days after confirmation and deposit. If one programme in the mix needs its own sample validated first, that runs in 1–7 days and can be done before the main order is placed.
Step 5 — Packing and loading. Cartons marked per model, loading plan issued so the receiving warehouse can check by model rather than by total count.
What to check in the quotation
A mixed-order quotation should be readable as a table, not as a paragraph. Make sure it has:
- One line per programme, with the vehicle, year range and quantity.
- The MOQ stated as per order, with the per-model quantities shown explicitly.
- Carton markings described, so your warehouse knows what to look for.
- The dates for production completion and loading.
- The Incoterm, so landed cost responsibility is clear.
If the quotation gives a total and a single price without the per-model split, ask for the split. It is the difference between an order you can receive and one you have to argue about.
What we do not claim
- We do not say mixing is free or unlimited. Every programme adds a module run and a carton type, and the per-model quantities are confirmed against the schedule rather than assumed.
- We do not quote a fixed minimum per model on a web page, because it depends on the mix. It is stated on the quotation for your specific list.
- We do not promise a loading date before the split is confirmed. A date given before the model list exists is a guess.
What to do next
Send the model list with year ranges and the quantities you are considering. We will come back with which programmes apply, the per-model split we can hold within the 100-set minimum, and the dates — normally within one business day.
- Wholesale, MOQ and ordering — full trade terms and the order sequence
- Kit specification — what a set contains
- Vehicle programme list — what we cover
- Payment terms and lead time — how the timeline runs
Frequently asked questions
Is the MOQ per model or per order?
The minimum is 100 sets per order. The per-model quantities within that order are confirmed when the model list is set, because each programme needs its own control module and its own carton marking. Ask for the split in writing on the quotation.
How are cartons marked in a mixed order?
Each carton carries a model marking, and the loading plan issued with the shipment lists quantities by model rather than only as a total. That is what allows your warehouse to check the delivery by programme instead of counting cartons and hoping.
Can I mix different product lines in one order?
Mixed vehicle models are the standard case. Mixing product lines — for example power liftgate kits with running board kits — is a separate question with its own programme and packing logic, so raise it at quotation stage and it will be quoted explicitly.
Does a mixed order take longer than a single-model order?
The lead time is about 30 working days after order confirmation and deposit, as with a single-model order. What changes is the scheduling: runs have to be sequenced so the right quantities finish together for one loading date, which is why the per-model split is confirmed before a date is committed.