Power Tailgate Payment Terms and Lead Time: How the Order Runs

2026-11-14 · JYJ Performance

Power Tailgate Payment Terms and Lead Time: How the Order Runs

Short answer: The order is confirmed in writing, 50% is paid with the order, production runs about 30 working days, and the balance is paid against a copy of the bill of lading. A sample kit ships in 1–7 days if you want to validate the fit first. The minimum order is 100 sets, and the 30 working days start from confirmed order and received deposit, not from the first enquiry.

What the question actually is

Buyers ask "what are your payment terms" and usually mean four different things at once:

  1. How much do I pay up front, and how much later?
  2. How long until the goods ship, and from which date?
  3. Can I see a sample before committing to the full quantity?
  4. What happens if something slips — on either side?

These are separate questions with separate answers, and most of the friction in a first order comes from one of them being assumed rather than stated. What follows is how an order actually runs with us, in the order events happen.

The sequence, in the order it happens

Step 1 — Confirmation. You send the model list and quantity. We confirm which vehicle programmes apply, the per-set price for that quantity, and the terms. Nothing starts until you approve the quotation in writing.

Step 2 — Sample, if you want one. Sample kits ship in 1–7 days. For a first order this is the cheapest way to validate the fit and the installation procedure before committing to 100 sets. It does not replace the MOQ; it de-risks it.

Step 3 — Deposit. 50% with the order. This is what starts production.

Step 4 — Production. About 30 working days after order confirmation and receipt of deposit. The clock starts at step 3, not at step 1 — a common point of confusion, and the source of most "it is late" conversations that are actually date-arithmetic.

Step 5 — Balance and shipping. Balance against a copy of the bill of lading. Final terms are stated on the quotation for your market.

What moves the lead time

The 30 working days is a production figure, and a few things change what it covers:

What we do not do is quote a lead time we cannot hold, or shorten it in the sales conversation and stretch it on the order. A date that moves after deposit costs more than a longer date given upfront.

What we do not do

What to get in writing before paying

Five things, all of which should appear on the quotation rather than in a chat message:

  1. The item list with quantities — what you are buying, per set.
  2. The Incoterm — FOB, CIF, or delivered.
  3. The production start date and the shipping date we can hold.
  4. The payment split and what document releases the balance.
  5. What the quotation excludes — duty, local tax, installation labour.

If any of the five is missing, ask before paying the deposit. It is a shorter conversation than the one after the goods are ready.

What to do next

Send the model list, quantity and destination port. We will return a quotation with the item list, Incoterm, payment split and the dates we can hold — normally within one business day.

Frequently asked questions

When do the 30 working days start?

They start when the order is confirmed and the 50% deposit is received, not when you first enquire or when the quotation is issued. Budget about 30 working days of production after that point, plus freight and customs transit, which are not included.

Can I order a sample before committing to 100 sets?

Yes. Sample kits ship in 1–7 days, and buyers commonly use one to validate fit and the installation procedure before placing the full order. The sample does not replace the 100-set minimum order; it reduces the risk of committing to it blind.

Do you accept letters of credit?

Standard terms are 50% with the order and the balance against a copy of the bill of lading. If your business requires an L/C, raise it at quotation stage so it can be stated in writing rather than negotiated after deposit.

What if the production date slips?

The date on the quotation is the date we commit to. If something changes on our side we tell you before the shipping date, not after. Freight and customs delays after dispatch are outside both parties' control and are tracked separately from production.